Section

AboitizPower adds over 200 MW of RE capacity to alleviate tight supply

7 months ago Philippines inquirer

A PHP Error was encountered

Severity: Warning

Message: getimagesize(https://newsinfo.inquirer.net/files/2024/05/AboitizPower-1.png): Failed to open stream: HTTP request failed! HTTP/1.1 403 Forbidden

Filename: views/amp_news_detail.php

Line Number: 138

Backtrace:

File: /home/moneynations/public_html/application/views/amp_news_detail.php
Line: 138
Function: getimagesize

File: /home/moneynations/public_html/application/controllers/News.php
Line: 132
Function: view

File: /home/moneynations/public_html/index.php
Line: 291
Function: require_once

Given tight supply conditions, Aboitiz Renewables, Inc. (ARI), the renewable energy (RE) arm of Aboitiz Power Corporation (AboitizPower), announced the timely inclusion of the 159 megawatt peak (MWp) Laoag Solar Power Plant in Aguilar, Pangasinan to help provide additional capacity and help minimize grid strain. A series of yellow and red alerts were declared in Read more at: inquirer

Tags : aboitizpower capacity alleviate tight supply

Disclaimer : We make no assurance about the completeness and accuracy of the content of this website. All news on this website is collected from various sources hence information may or may not be true. Bollywood charcha does not verify the reliability of the content published. We do not accept any accountability for loss or damage occurred as a result of reliability on the content of this website.

You May Also Like