Section

Manila Water to widen sewer coverage in Rizal with P1.6-B project

2 months ago Philippines inquirer

A PHP Error was encountered

Severity: Warning

Message: getimagesize(https://newsinfo.inquirer.net/files/2024/10/WhatsApp-Image-2024-10-02-at-5.42.23-PM.jpeg): Failed to open stream: HTTP request failed! HTTP/1.1 403 Forbidden

Filename: views/amp_news_detail.php

Line Number: 138

Backtrace:

File: /home/moneynations/public_html/application/views/amp_news_detail.php
Line: 138
Function: getimagesize

File: /home/moneynations/public_html/application/controllers/News.php
Line: 132
Function: view

File: /home/moneynations/public_html/index.php
Line: 291
Function: require_once

MANILA, Philippines – To further bolster its wastewater services in the East Zone of Metro Manila, Manila Water is implementing the construction of the P1.6-billion San Mateo-Rodriguez Sewerage System Package 1A (SMR P1A-SM) since the beginning of this year. SMR P1A-SM is seen as a cornerstone of the larger San Mateo-Rodriguez Sewerage System, designed to Read more at: inquirer

Tags : manila water widen sewer coverage rizal project

Disclaimer : We make no assurance about the completeness and accuracy of the content of this website. All news on this website is collected from various sources hence information may or may not be true. Bollywood charcha does not verify the reliability of the content published. We do not accept any accountability for loss or damage occurred as a result of reliability on the content of this website.

You May Also Like