Section

Manila Water’s Calawis Water Supply System Project in final stages of testing

10 months ago Philippines inquirer

A PHP Error was encountered

Severity: Warning

Message: getimagesize(https://newsinfo.inquirer.net/files/2024/02/WhatsApp-Image-2024-02-08-at-17.49.41_613f3e38.jpg): Failed to open stream: HTTP request failed! HTTP/1.1 403 Forbidden

Filename: views/amp_news_detail.php

Line Number: 138

Backtrace:

File: /home/moneynations/public_html/application/views/amp_news_detail.php
Line: 138
Function: getimagesize

File: /home/moneynations/public_html/application/controllers/News.php
Line: 132
Function: view

File: /home/moneynations/public_html/index.php
Line: 291
Function: require_once

Manila Water’s P8.2-billion Calawis Water Supply System Project (WSSP), which was physically completed in June 2023, is already supplying clean and potable water to some areas in Antipolo, including the Antipolo Government Center. After the testing stage in May 2024, the Calawis WSSP is expected to provide up to 80 million liters per day (MLD) Read more at: inquirer

Tags : manila water calawis water supply system project final stages testing

Disclaimer : We make no assurance about the completeness and accuracy of the content of this website. All news on this website is collected from various sources hence information may or may not be true. Bollywood charcha does not verify the reliability of the content published. We do not accept any accountability for loss or damage occurred as a result of reliability on the content of this website.

You May Also Like