Section

PH longest bridge now powered by P60-M hybrid solar farm

2 years ago Philippines inquirer

A PHP Error was encountered

Severity: Warning

Message: getimagesize(https://newsinfo.inquirer.net/files/2023/04/Regions452710-300x212.jpg): Failed to open stream: HTTP request failed! HTTP/1.1 403 Forbidden

Filename: views/amp_news_detail.php

Line Number: 138

Backtrace:

File: /home/moneynations/public_html/application/views/amp_news_detail.php
Line: 138
Function: getimagesize

File: /home/moneynations/public_html/application/controllers/News.php
Line: 132
Function: view

File: /home/moneynations/public_html/index.php
Line: 291
Function: require_once

CEBU CITY, Cebu, Philippines — The Cebu-Cordova Link Expressway (CCLEX), the picturesque third bridge linking mainland Cebu to Mactan Island and now turning to be a new landmark here, is going solar. The corporation that operates the toll bridge has announced the completion of its P60-million on-grid and hybrid solar farm located near the foot […]

The post PH longest bridge now powered by P60-M hybrid solar farm appeared first on Inquirer News.

Read more at: inquirer

Tags : longest bridge powered hybrid solar

Disclaimer : We make no assurance about the completeness and accuracy of the content of this website. All news on this website is collected from various sources hence information may or may not be true. Bollywood charcha does not verify the reliability of the content published. We do not accept any accountability for loss or damage occurred as a result of reliability on the content of this website.

You May Also Like