Section

Renewable power for Bacolod expected in 2024

one year ago Philippines inquirer

A PHP Error was encountered

Severity: Warning

Message: getimagesize(https://newsinfo.inquirer.net/files/2022/06/Ceneco1-300x169.png): Failed to open stream: HTTP request failed! HTTP/1.1 403 Forbidden

Filename: views/amp_news_detail.php

Line Number: 138

Backtrace:

File: /home/moneynations/public_html/application/views/amp_news_detail.php
Line: 138
Function: getimagesize

File: /home/moneynations/public_html/application/controllers/News.php
Line: 132
Function: view

File: /home/moneynations/public_html/index.php
Line: 291
Function: require_once

BACOLOD CITY — The mayor of this city expressed the hope that power utilized within the Central Negros Electric Cooperative (Ceneco) franchise area would come from completely renewable sources by next year. Bacolod Mayor Alfredo Abelardo Benitez met on Sept. 5 with Roel Castro, Primelectric Holdings Inc. president and chief executive officer, whose firm has

The post Renewable power for Bacolod expected in 2024 appeared first on Inquirer News.

Read more at: inquirer

Tags : renewable power bacolod expected

Disclaimer : We make no assurance about the completeness and accuracy of the content of this website. All news on this website is collected from various sources hence information may or may not be true. Bollywood charcha does not verify the reliability of the content published. We do not accept any accountability for loss or damage occurred as a result of reliability on the content of this website.

You May Also Like