Section

Taguig court stops bidding for Meralco power supply contracts

4 months ago Philippines inquirer

A PHP Error was encountered

Severity: Warning

Message: getimagesize(https://newsinfo.inquirer.net/files/2022/09/MERALCO-09122022-v02.png): Failed to open stream: HTTP request failed! HTTP/1.1 403 Forbidden

Filename: views/amp_news_detail.php

Line Number: 138

Backtrace:

File: /home/moneynations/public_html/application/views/amp_news_detail.php
Line: 138
Function: getimagesize

File: /home/moneynations/public_html/application/controllers/News.php
Line: 132
Function: view

File: /home/moneynations/public_html/index.php
Line: 291
Function: require_once

MANILA, Philippines — The Taguig Regional Trial Court stopped on Wednesday the Manila Electric Co.’s (Meralco) scheduled auction of contracts to supply 1,000 megawatts (MW) of additional power. The bid submission deadlines for the 600MW and 400MW contracts were scheduled on Aug. 2 and 9, respectively. Through a temporary restraining order (TRO) valid for 72 Read more at: inquirer

Tags : taguig court stops bidding meralco power supply contracts

Disclaimer : We make no assurance about the completeness and accuracy of the content of this website. All news on this website is collected from various sources hence information may or may not be true. Bollywood charcha does not verify the reliability of the content published. We do not accept any accountability for loss or damage occurred as a result of reliability on the content of this website.

You May Also Like